Description
APS Mining and Infrastructure India Private Limited
Name of Project: Sitamma Lift Irrigation Project
Principal Employer: Irrigation & CAD, Telangana Government
Name of Client: L&T
Project Description: Multipurpose Dam
Scope of Project:
Construction of barrage in the river Godavari and head regulator near Dummugudem to divert 70 TMC of Godavari River water to cannel
APS Scope:
1.Cofferdam construction in the river Godavari to divert water.
2.Excavation of hard rock as per the drawings:
Upstream side: 439m
Downstream side: 425m with slope.
3.Excavation of anchor key with a depth of 2.5m width of 1 meter in upstream, mid, and downstream areas.
4.Scope includes bottom finishing with a clear rock surface for PCC laying.
5.Feeding the excavated hard rock to the crusher to convert it into useful 20mm and 40mm blue metal.
6.Mixing concrete in the batch plant and transporting it to the excavated area for concrete placement.